„LIDL CAMPUS"

The construction site is currently developing according to plan. The interior work on the basement floors has begun, as have the technical installations. The facade work, such as the glazing, began at the beginning of January, and the lower floors are already glazed. Around 400 construction workers are currently employed on the construction site, completion is planned for the end of 2020.
(1. Photo by Lidl, others by kadawittfeldarchitektur)

#kadawittfeldarchitectur #kwbau #constructiondiary #constructionsite #architecturaldesign[[[SEPARATOR]]]https://www.instagram.com/p/B1WKYBxiMGx/
    [post_title] => CONSTRUCTION DIARY: „LIDL CAMPUS" The construction site is currently developing according to plan. The interior work on the basement floors has begun, as have the technical installations. The facade work, such as the glazing, began at the beginning of January, and the lower floors are already glazed. Around 400 construction workers are currently employed on the construction site, completion is planned for the end of 2020. (1. Photo by Lidl, others by kadawittfeldarchitektur) #kadawittfeldarchitectur #kwbau #constructiondiary #constructionsite #architecturaldesign
    [post_excerpt] => 
    [post_status] => publish
    [comment_status] => closed
    [ping_status] => closed
    [post_password] => 
    [post_name] => construction-diary-lidl-campus-the-construction-site-is-currently-developing-according-to-plan-the-interior-work-on-the-basement-floors-has-begun-as-have-the-technical-installations-the
    [to_ping] => 
    [pinged] => 
    [post_modified] => 2019-08-19 15:35:59
    [post_modified_gmt] => 2019-08-19 13:35:59
    [post_content_filtered] => 
    [post_parent] => 0
    [guid] => https://www.kadawittfeldarchitektur.de/en/?p=6453
    [menu_order] => 0
    [post_type] => post
    [post_mime_type] => 
    [comment_count] => 0
    [filter] => raw
)

Template: index.php