Central Station Salzburg 

Info

BRIEF Optimization of the track access and the roofing of the new platforms within the existing train station | ADDED VALUE Though an expansion of the underpass into a shopping gallery, the access to the trains is upgraded through natural lighting over the generous platform entrances, from a dark access space to an open pedestrian zone. The new organization of the Salzburg train station becomes an urban density project that not only serves the mobility and comfort of the traveller but also creates a public space and connects various districts of the city.


CENTRAL STATION SALZBURG | AUSTRIA The authentic integration of the existing historic structures into the new overall scheme for the central station in Salzburg lends the complex its unique, fascinating character. Following the tracks, the curved platform roofs nestle at a respectful distance against the carefully restored, intricately constructed historic platform hall and form a spacious, continuous roof surface above the platforms. This dynamic spatial construct interprets the movements of the trains that are entering or slowing down, and thus gives the station its unmistakable appearance. Above the restored historic concourse, a dynamically landscaped urban space with airy height, the Passage, not only links the various levels and functions of the station project, but also provides essential urban impulses as a connection between the two city districts on either side of the tracks.

Location:
Salzburg (AT)
Volume:
ea 13.000m² construction volume 140.000m³
Client:
ÖBB Infrastruktur Bau AG
Duration:
2008 - 2013
Award:
2012 - SOLID BauTechPreis (Zeman & Co GmbH)
Bild von LBS Redl Luftbildservice © ÖBB

Blog

  • 03.05.2012

    Erste Shops am Salzburger Hauptbahnhof

    Bahnhofs-Vorfreude...
    ...bis 01.06. ist noch viel zu tun!

    posted from Aldrik Lichtwark
  • 27.04.2012

    1. Platz mit dem Projekt Dachkonstruktionen Salzburg Hauptbahnhof

    1. Platz mit dem Projekt Dachkonstruktionen Salzburg Hauptbahnhof

    Zeman Stahlbau Wien konnte den SOLID Bautech-Preis 2012 für sich entscheiden.
    Wir freuen uns mit!

    posted from Lutz Langer
  • 14.12.2011

    Mit dem Railjet nach Salzburg

    Mit dem Railjet nach Salzburg
    posted from Lutz Langer
  • 30.11.2011

    Impressionen…

    Impressionen…
    posted from Michael Tremmel
  • 16.11.2011

    Impressionen vom Hauptbahnhof Salzburg

    Impressionen vom Hauptbahnhof Salzburg
    posted from Lutz Langer
  • 04.11.2011

    Noch 2 Tage...

    Noch 2 Tage...

    …und seit heute mittag leuchtet der Glassteg

    posted from Holger Giesen
  • 25.10.2011

    Noch 12 Tage...

    Noch 12 Tage...

    ...und der erste Zug soll rollen.

    posted from Holger Giesen
  • 18.10.2011

    Advent, Advent...ein Lüster hängt.

    Advent, Advent...ein Lüster hängt.

    Der erste Leuchter hängt...zumindest angeliefert in real-historischer Bettwäsche!

    posted from Holger Giesen
  • 30.09.2011

    Freie Fahrt durch das Nelböckviadukt am Salzburger Hauptbahnhof

    Freie Fahrt durch das Nelböckviadukt am Salzburger Hauptbahnhof

    Pensionist testet das neue Nelböckviadukt.

    posted from Lutz Langer
  • 23.08.2011

    WYSIWYG

    WYSIWYG

    Membrane aus Tenara PTFE-Gewebe installiert

    posted from Lutz Langer
  • 14.07.2011

    Neues aus Salzburg: Schallmoos

    Neues aus Salzburg: Schallmoos

    Entwicklung des Eingangsgebäude zum Stadtteil Schallmoos in Jahren (v.o.n.u.)
    2006: Lutz
    2008: Kerstin
    2011: 3 Varianten

    posted from Tim Danner
  • 13.07.2011

    Dächer

    Dächer
    posted from Lutz Langer
  • 17.06.2011

    Twist again...

    Twist again...
    posted from Holger Giesen
  • 08.06.2011

    Twist

    Twist
    posted from Lutz Langer
  • 07.05.2011

    Wellstegträger

    Wellstegträger
    posted from Lutz Langer
  • 06.05.2011

    Y..MCA Salzburg

    Y..MCA Salzburg

    Die ersten Stahlteile sind montiert.

    posted from Lutz Langer
  • 05.05.2011

    Teleskoparbeitsbühnenchoreographie live!

    …vor 5 Minuten auf der Baustelle in Salzburg

    posted from Lutz Langer
  • 25.02.2011

    Dzień dobry!

    Dzień dobry!

    Gestern Morgen im Werk nahe Katowice - die ersten neuen Stützen für den Hauptbahnhof Salzburg!

    posted from Lutz Langer
  • 17.02.2011

    Medizinische Fußpflege in Salzburg

    Medizinische Fußpflege in Salzburg

    Die Binderfüße der Stahlkonstruktion nach ihrem Kuraufenthalt in Polen!

    posted from Holger Giesen
  • 11.02.2011

    Lego Technic

    Lego Technic

    ...oder die Rückkehr der Tonne. Die ersten, restaurierten Teile der historischen Stahlhalle sind zurück auf der Baustelle!

    posted from Holger Giesen
  • 20.01.2011

    Tonnenfüße für Salzburg in Polen

    Tonnenfüße für Salzburg in Polen

    Die ersten Stahlteile für den Wiederaufbau der historischen Halle sind bereit. Im Hintergrund ein zerteilter Binder.

    posted from Lutz Langer
  • 19.01.2011

    Original und Fälschung

    Original und Fälschung

    ...ein bisschen Rialto in Salzburg.

    posted from Holger Giesen
  • 26.11.2010

    Hauptbahnhof Salzburg...

    Hauptbahnhof Salzburg...

    ...nimmt Form an.

    posted from Holger Giesen
  • 07.07.2010

    Achtung an Gleis 2!

    Achtung an Gleis 2!

    Stützen und Gleistragwerke werden eingeschalt und betoniert.

    posted from Lutz Langer
  • 13.09.2009

    Hauptbahnhof Salzburg - Wir sind Baustelle!

    Hauptbahnhof Salzburg - Wir sind Baustelle!
    posted from Lutz Langer
  • 09.09.2009

    Musterfläche Membrandach

    Musterfläche Membrandach

    …die Vorspannung steigt.

    posted from Lutz Langer